Factory Price 400W 500W 600W ADC12 160lm/w 170lm/w staddium football pitches sport field tennis court golf course wharf high mast light
World class level chips, high brightness, low light decay & long life-time
International driver brand, overheat protection, high convert efficiency, high PF & surge protection, (1-10V,DALI2.0)
Die-casting technology with ADC12, excellent thermal management and balance the internal & external temperature, reduce chip Tj and light decay.
Optical UV resistant PC lens with 94% light transmitance, IK08. Light Distribution: 10°/15°/25°/45°/60°/90°/Asymmetrical 60°
Bracket Installation, operation temperature: -35C- +50C
Model N0. |
MF-QCDG-S400w |
MF-QCDG-S500w |
MF-QCDG-S600w |
MF-QCDG-S800w |
MF-QCDG-S1000w |
MF-QCDG-S1200w |
MF-QCDG-S1500w |
MF-QCDG-S1800w |
lnputVoltage |
AC100-277v |
output Voltage |
DC42 |
Rated Power |
400w |
500w |
600w |
800w |
1000w |
1200w |
1500W |
1800W |
Qty of LED |
840PCS*3030 |
840PCS*3030 |
840PCS*3030 |
168CPCS*3030 |
1680PCS*3030 |
168OPCs*3030 |
2520PCS*3030 |
2520PCs*3030 |
PF |
>0.95 |
LED Brand |
World class level |
Luminous Flux |
60000lm±5% |
75000lm±5% |
90000lm±5% |
120000lm±5% |
150000lm±5% |
180000lm±5% |
225000Im5% |
270000lm5% |
CRI |
Ra>80 |
CCT |
3000-6500K |
Beam Angle |
10/25/45/60/90 Asymmetrical 60° |
Driver Brand |
MW/SOSEN |
THD |
<10% |
lK Rating |
IK08 |
Rating |
IP66 |
Life Span |
50000Hrs |
Size |
718*214*222mm |
718*214*222mm |
718*214.222mm |
732*439*290mm |
732.439*290mm |
732*439*290mm |
732*666*290mm |
732*666*290mm |
N.W |
19.15kg |
19.65kg |
20.05kg |
32.00kg |
33.0Okg |
34.0Okg |
46.00kg |
47.30kg |
G.W |
21.55kg |
22.05kg |
22.5skg |
35.30kg |
36.30kg |
37.30kg |
49.70kg |
51.00kg |
Product dimension:
400W/500W/600W
Photometry
Installation Instructions
To install a high mast light, the following steps and precautions should be taken:
1.Choose the right installation location: The high mast light should be installed above the area that needs illumination, taking into account factors such as the light projection range and surrounding environment. Also, the foundation conditions and nearby structures should be considered for potential impact.
2.Prepare equipment and tools: Confirm the type and quantity of high mast lights needed and prepare the necessary tools and equipment, such as cranes, welding machines, bolts, and angle irons.
3.Install the foundation: Select a suitable reinforced concrete foundation based on the size and weight of the high mast light and install an iron plate "socket" on the foundation for later installation of the high mast light.
4.Install the high mast light: Connect the base of the high mast light to the socket and secure it with bolts. Then, use a crane to lift the high mast light onto the socket and secure it with bolts.
5.Connect the power supply: Connect the cable of the high mast light to the power line and ensure the wiring is correct, secure, and well-insulated.
6.Test and adjust: After installation, test and adjust the high mast light to ensure it operates normally and has even light distribution.
Becareful!
1. Please use the product in accordance to this instruction
2. Please do not replace components or modify lamps without authorization
Attention
1. For your safety, please cut off the supply before install the product
2. For the well function, please choose the voltage within the range specified on the product.
3. To avoid damage to the eyes, do not stare at a LED Light source long time.
4. Please follow the correct installation steps to install this product, for your safety, please cut off the electricity before installation.
Ideal for football pitches, sports fields, airport hangers, Wharfs, Tower Cranes, Golf Course, stadium etc.
FAQ:
Q1: Are you a manufacturer?
MF: Yes, we are a manufacturer with our own factory. We have over 14 years of experience in research and development, as well as manufacturing, and we operate based on ISO quality management since 2009.
Q2: Can I order a sample of the LED High Mast Light?
MF: Yes, we welcome sample orders to test and check the quality of our products. Mixed samples are also acceptable.
Q3: What is the lead time for the LED High Mast Light?
MF: For sample orders, the lead time is 3-7 days, and for mass production orders, it is 15-25 days. The exact lead time depends on the order quantities.
Q4: How do you ship the finished products?
MF: We offer optional shipping methods such as by SEA, AIR, or Express (DHL, UPS, FedEx, TNT, etc.).
Q5: Can I print my logo on the LED High Mast Light?
MF: Yes, we provide OEM service to our customers. We can help to make the label and color box according to your requirements.
Q6: How do I proceed with an order for the LED High Mast Light?
MF: Firstly, please let us know your detailed requirements and application environment. Secondly, we will recommend some suitable products and solutions to you based on your request. Thirdly, after confirming all the details, customers will issue a purchase order and make the payment to confirm, and then we will start production and arrange shipment.
Q7: How do you handle defective products?
MF: All of our products are produced in strict quality control systems, and the defective rate is less than 0.2% according to our shipment records. We offer a 5-year warranty for this product. If there is any defect during the warranty period, please provide pictures or videos of the defective lights in working situations, and we will ship new lights to you within a few days or together with your next order.