Factory Price 2FT 4FT 5FT Linkable Commercial CCT Adjustable Switchable 3 Power Dimmable 18W 36W 50W IP66 IP69K LED Tri-Proof Light Dimmable Batten Light
Contact Supplier
Product Highlights
- CCT & Power Switchable: Adjustable 3000K-6000K and 3 power options (18W/36W/50W) to replace 9 items.
- High Protection Rating: IP66/IP69K waterproof and dustproof with IK08 impact resistance.
- Linkable Design: Easy to link multiple units for seamless installation in large areas.
- Durable Material: Constructed with imported fire-proof PC and aluminum for safety.
- Versatile Installation: Supports ceiling, hoisting, and wire rope hanging methods.
- Long Lifespan: Rated lifespan of 50,000 hours with a 5-year warranty.
- High Efficiency: Luminous flux up to 175LM with power factor >=0.9.
- Patent Design: Elegant appearance with anti-drop barb-type mounting clips.
Product Attributes
- Customization
- Available
- Application
- Warehouse/Sports Stadiums/Residential/Parking Lot
- Type
- Linkable Triproof Light
- Model NO.
- MF-LI12H36W-GC1(20/28/36W Dim)
- Feature
- Anti-corrosion, Dust-Proof, Waterproof
- Light Body Material
- Durable PC+ Aluminum
- Power
- 50W-42W-35W
- Beam Angle
- 180°
- Input Voltage
- AC100-277VAC 50Hz/60Hz
- Lifespan
- ≥50000hrs
- IP
- IP66
- Ik
- Ik08
- Luminous Flux (Lm)
- 140lm/W±10%
- Thd
- <15%
- Warranty Period
- 5 Years
- CCT
- 3000K-4000K-5000K-6000K
- LED Chip
- SMD2835
- Transport Package
- 12PCS/Carton
- Specification
- 65.5x26.5x19cm/20pcs/CTN/10.5Kg
- Trademark
- MF
- Origin
- China
- HS Code
- 9405499000
- Production Capacity
- 10000PCS Per Months
Product Images of Factory Price 2FT 4FT 5FT Linkable Commercial CCT Adjustable Switchable 3 Power Dimmable 18W 36W 50W IP66 IP69K LED Tri-Proof Light Dimmable Batten Light
Find Similar Products
Product Description
CCT & Power Switchable & Linkable
Temperature Characteristics T-ambient 25 C
Temperature
Operating -20~+40 ºC
Storage -40~+85 ºC
Electrical Characteristics
Input Voltage: AC100~277V 50/60Hz
PF:≥0.9 Color Temperature 3000K-6500K(3CCT adjustable)
Power Efficiency:≥0.9
| Product Code |
MF-LI12H36W-GC1
|
| Rated Power |
50W-42W-35W Power Switchable
|
| LED Type | SMD2835 |
| LED QTY | 624 |
| Luminous Flux(LM) |
175-160-140LM |
| Length | 5FT |
| Power Factor | >=0.9 |
| Color Temperature | 3000K-4000K-6000K |
| IP Class | IP66 IK08 |
| Input Voltage | 100-277V, 50/60Hz |
| Temperature |
Operation:-20°C ~+40°C |
| CRI | >80 |
| Warranty | 5 years |
| Viewing Angle | 180° |
1.CCT+3 power switchable , One lamp can instead of 9 items , save a lot of stock funds .
2. Elegant appearance and patent design,Imported fire-proof PC material, safer and more reliable.
3. Imported fire-resistant PC material, safer and more reliable.
4. Barb-type mounting clip, both anti-drop and easy to install.
5. A variety of installation methods: lamps can be linkable or not, ceiling installation, hoisting, wire rope hanging, etc.
6. Pass EMC power supply, meet the certification requirements.
7. IP69K, IK08, IP66.

Parameter

Installation 1 steps:
1.Drill Ø4mm holes on the surface
2.Put the expansion tube into the drilled hole
3.Using screws to lock the hook into the expansion tube
4.Align the lamp with the hook and lock it
Installation 2 steps:
1. According to the three holes of the sling fixing, drill Ø4mm holes on the surface, then put the expansion tube into the drilled hole,lastly use screws to lock the sling fixings.
2.According to the last picture, use a screwdriver to lock the hook into the end of the sling.
Matters needing attention
The lighting fixtures should be installed, connected and tested by a certified installer based on the local regulations.
Lamps should always be installed or replaced with care.
Please check the local voltage in accordance with the product requirements before using the product.
Relamping only can be done when the power is off and the lamp is completely cooled down.
When a lamp is to be cleaned, make the power off and let it cool down completely.Clean the fixture with a soft cloth and a standard PH neutral detergent. Stainless steel finishing should be maintained regularly
Misuse of, or changes to the fixture shall nullify the guarantee.
Don't cover the fixtures with flammable materials.
Exclusively replaced by the manufacturer or his service agent or the similar qualified person in order to avoid a hazard.
Docking wiring diagram
2.insert the corresponding brown wire into the red hole,
3. the blue wire into the black hole, and the yellow-green ground wire into the yellow hole (Figure 2),
4. finally tighten the waterproof connector (Figure 3). If the cord cannot be inserted directly, press the corresponding button before inserting the cord.
Packing Info:
| Model | Inner Box Size(mm) | Carton Size(mm) | QTY/CTN | G.W/CTN |
|
MF-LI06H18W-GC1
|
600*74*74
|
620*320*240mm
|
12piece/Carton
|
9kg
|
|
MF-LI12H36W-GC1
|
1200*74*74
|
1220*320*240mm
|
12piece/Carton
|
9kg
|
|
MF-LI15H50W-GC1
|
1500*74*74
|
1620*320*240mm
|
12piece/Carton
|
18kg
|
Delivery:
Mingfeng Lighting is committed to providing timely and reliable delivery services. We offer a range of shipping options, including air, sea, or land transportation, to ensure that products are delivered safely and efficiently. Delivery times vary depending on the destination and shipping method, and we work closely with customers to provide accurate delivery estimates and tracking information.
It is mainly used for warehouse, subway, workshop, supermarket, shopping mall, office, indoor parking lot or other indoor industrial lightings.

FAQ:
-
Are you a manufacturer?
Absolutely, we are a professional manufacturer with 16 years of experience.
Our products include IP67 waterproof recessed lights, aluminum garden outdoor landscape lighting, inground buried lamp, and LED underground lights. -
What is your main product?
Our main products are as follows:
LED Triproof lights/ LED Vapor Tight Lights
LED High Bay Lights
LED Flood lgihts
LED Explosion Proof Lights
LED Down Lights
LED underwater lights (swimming pool lights, fountain lights, underwater spotlights)
LED garden spot/spike lights
LED inground lights -
What is the minimum order quantity (MOQ)?
For customized models, samples should be prepaid. We offer free customized models if the order quantity is more than 1000 pieces. -
What are the payment options?
We accept T/T, Western Union, Paypal. Payment terms are 50% advanced payment and 50% balance payment. Our shipping terms are EXW, FOB, and CIF, CNF and DDP -
What is the delivery time?
The delivery time is about 5-7 working days for samples and 20-30 working days for mass production, depending on the quantity. -
How are the products packaged?
Each piece is packed in an individual color box and then placed in a strong master carton. -
Why should you choose us?
1). We offer OEM/ODM services.
2). We have our own design team.
3). We offer high-quality products at reasonable prices.
4). We have no MOQ request.
5). Our sales team has 12 years of experience in underwater lighting.
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASI2321631". Items marked "" are certified.
Company Profile
As a leading manufacturer of LED light product MING FENG LIGHTING Co., Ltd established in year 2009 and has more than 14 years experience in exporting LED lighting products. We are producing LED Tri-Proof Lights, LED Vapor Tight Lights, LED Down Lights, LED Flood Light, LED Sport Light, LED Stadium light, LED High Bay Light, LED Explosion Proof Light and some of outdoor LED landscape light.
Our company established a quality management system in accordance with the ISO9001 standard. Products are CE, CB, RoHS, SAA ETL, DLC certified. And now Ming Feng has expanded its business to many countries to Europe, America, Southeast Asia and etc. Ming Feng's lighting products enjoy a wide range of application. Like workshop, railway, building, airport tunnel and mines.
In order to provide our customers with attractive lighting fixtures, optimal energy saving and thoughtful lighting solutions, Ming Feng hired the professional, Dialux lighting designer, and providing the OEM & ODM service for all the partners around the world, Our designer and engineer always pay full attention to them in the field of high quality standard at reasonable and competitive price, fast delivery, trust and honest services etc.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- 2nd Floor, Building 2, Zao San Street 5th, Dongcheng District, Dongguan, Guangdong, China
-
Plant Area
- 1500 square meters
-
Number of Employees
- 28
-
Registered Capital
- 1,000,000 RMB
-
Terms of Payment
- LC, T/T, D/P, PayPal, Western Union, Small-amount payment
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR, EXW
-
Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays -
Nearest Port
- Shenzhen Port
-
Minimum Order Quantity
- 1
-
Supply Chain Partners
- 30
Our Production Capability & Technical Expertise
-
Main Products
- LED Flood Light, LED High Bay Light, LED Wall Light, Tri-proof Light, Atex Lamp, LED Street Light, LED Outdoor Spot Light, LED Stadium Light
-
Production Lines
- 3
-
Production Machines
- Assembly Line, Aging Rack
-
QA/QC inspectors
- 3 people
-
Inspection Type for Finished Products
- 100% inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Have instructions and uniformly followed
-
Customization Options
- Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 7 people
-
Traceability of Raw Materials
- Yes
-
Test Reports for Raw Materials
- Others
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2016-08-31
-
Export Year
- 7 Years
-
Main Markets
- North America, Europe, Southeast Asia/ Mideast, Africa
-
Repeat Buyers Choice
- 50%~80%
-
Number of Foreign Trading Staff
- 5
-
Overseas Agent/Branch
- Yes
-
New Products Launched in Last year
- Yes
Our Certifications, Standards & Industry Recognition
-
Product Certification
- CE, Others
-
Cooperated with Fortune 500
- Yes
FAQ
- Are you a manufacturer?
- Absolutely, we are a professional manufacturer with 16 years of experience.
- What is your main product?
- Our main products include LED Triproof lights, LED Vapor Tight Lights, LED High Bay Lights, LED Flood lights, LED Explosion Proof Lights, LED Down Lights, LED underwater lights, LED garden spot/spike lights, and LED inground lights.
- What is the minimum order quantity (MOQ)?
- For customized models, samples should be prepaid. We offer free customized models if the order quantity is more than 1000 pieces.
- What are the payment options?
- We accept T/T, Western Union, and Paypal. Payment terms are 50% advanced payment and 50% balance payment. Our shipping terms are EXW, FOB, and CIF, CNF and DDP.
- What is the delivery time?
- The delivery time is about 5-7 working days for samples and 20-30 working days for mass production, depending on the quantity.
- How are the products packaged?
- Each piece is packed in an individual color box and then placed in a strong master carton.
- Why should you choose us?
- We offer OEM/ODM services, have our own design team, provide high-quality products at reasonable prices, have no MOQ request, and our sales team has 12 years of experience in underwater lighting.
Send your message to this supplier
People who viewed this also viewed
-
US$50.50-191.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Tri proof Light
- Gecco I
- Factory Price 2FT 4FT 5FT Linkable Commercial CCT Adjustable Switchable 3 Power Dimmable 18W 36W 50W IP66 IP69K LED Tri-Proof Light Dimmable Batten Light
Hot Searches
- LED Light Factories
- LED Light Bulb Factories
- LED Street Light Factories
- LED Garden Light Factories
- Led Ceiling Light Lamp
- Waterproof Led Light Fixture
- Led Ceiling Lamp Light Fixture
- Led Ceiling Light Fixture Indoor
- Led Tube Light Fixture
- Batten Light Fixture LED Bulkbuy